TOE 1.54% 33.0¢ toro energy limited

Ann: Updated Scoping Study Results Lake Maitland Uranium Project, page-323

  1. 524 Posts.
    lightbulb Created with Sketch. 111
    I think you're looking at a narrow section of the many possibilities if a take over were to occur.
    BHP could even buy it with there drink kitty at the moment and keep it until they decide what to do with it, they mine all three products Nickel,Gold and Urnaium. Also the Canadian group Cameco already have two possibilities for the future sitting in WA a third which is not very far away from their Yeellirrie project.might tickle their fancy both these two companies have enough money to think long term for backup to keep their billions plodding along.
    But i hope what ever happens eventuates soon and sparks a take off.
 
watchlist Created with Sketch. Add TOE (ASX) to my watchlist
(20min delay)
Last
33.0¢
Change
0.005(1.54%)
Mkt cap ! $39.69M
Open High Low Value Volume
32.5¢ 33.0¢ 32.5¢ $15.03K 45.82K

Buyers (Bids)

No. Vol. Price($)
1 25000 32.5¢
 

Sellers (Offers)

Price($) Vol. No.
33.0¢ 10125 1
View Market Depth
Last trade - 10.21am 24/07/2024 (20 minute delay) ?
TOE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.