Hard to imagine their quoted 10K ounces per year with that type of equipment guessing it could comfortably handle 10 tons a day on a 20 hour per day schedule , which is 3600 tons a year , but that would require ore that was 3 ounces a ton in grade , is the ore that high in grade ?
- Forums
- ASX - By Stock
- Ann: Upgraded gold mining plant for HGZ Gold Mine
Hard to imagine their quoted 10K ounces per year with that type...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)