re: Ann: US$10.5 million increase in Bank Fac... JM,
Unless that was tongue in cheek, i can confirm that the 1/4rlys are not late. Having called the ASX today (because we are not listed on the market calendar - via etrade - to issue a 1/4rly report) i can confirm that today is the date for the 1/4rly releases to be lodged with ASX.
Not late therefore at all. But like i said, i think you were tongue in cheek...?
- Forums
- ASX - By Stock
- MAE
- Ann: US$10.5 million increase in Bank Facility
Ann: US$10.5 million increase in Bank Facility , page-24
-
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)