MNB 3.64% 5.7¢ minbos resources limited

HIGHLIGHTSFertilizer plant and equipment are now enroute to...

  1. 20,174 Posts.
    lightbulb Created with Sketch. 863

    HIGHLIGHTS

    • Fertilizer plant and equipment are now enroute to Angola with Development and EPCM activities ramping up in anticipation of first production H2 2023.

    • First shipments have landed in Angola, with 7 x 40-foot containers arriving in the Port of Cabinda, containing conveyer belts, twin screens and vehicles.

    • 21 x 40-foot and 2 x 20-foot containers have departed the Port of Houston (Fig. 1-2), with the crusher, dust collectors, bin activators, crossbelt Magnets, polishing screens, dust collectors, screw conveyors and conveyor belts and 9 x breakbulk pieces enroute to Angola.

    • 5 x 40-foot and 1 x 20-foot containers have left from the Port of Hong Kong and include a truck unloader.

    • Initial construction activities at the Cácata phosphate deposit are on target and within budget.

      19th January 2023 - for production 2nd half of 2023

      May 2024 and still no funding after nearly 18 months




    Last edited by Merchant2000: 26/04/24
 
watchlist Created with Sketch. Add MNB (ASX) to my watchlist
(20min delay)
Last
5.7¢
Change
0.002(3.64%)
Mkt cap ! $49.31M
Open High Low Value Volume
5.6¢ 5.9¢ 5.6¢ $19.16K 336.5K

Buyers (Bids)

No. Vol. Price($)
2 90894 5.6¢
 

Sellers (Offers)

Price($) Vol. No.
5.9¢ 47420 1
View Market Depth
Last trade - 16.10pm 10/06/2024 (20 minute delay) ?
Last
5.7¢
  Change
0.002 ( 3.64 %)
Open High Low Volume
5.6¢ 5.9¢ 5.6¢ 142487
Last updated 15.49pm 10/06/2024 ?
MNB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.