May is a stones throw away
Do they actually need much of a backup generator once in production for a few months given reliable grid power and ramp up?
Plant will run up, work through teething issues and maximize flake preservation and minimize contaminates Once in production overproduce initially to create a stockpile, which could be used to fill in gaps to grid power issues. I would not optimize a new plant right to customer needs from the get go, better to have some slack.
Other small producers, especially in the mineral sans area, create a stockpile for plant issues..Physical insurance policy. A few months over time.
WKT Graphite... Jumbo flake, 15+ year resource...
- Forums
- ASX - By Stock
- Ann: US$20m debt facility to complete the Lindi Jumbo Project
May is a stones throw away :-)Do they actually need much of a...
-
-
- There are more pages in this discussion • 128 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $63.76M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
WKT (ASX) Chart |
Day chart unavailable
The Watchlist
3DA
AMAERO INTERNATIONAL LTD
Hank Holland, Executive Chairman and CEO
Hank Holland
Executive Chairman and CEO
Previous Video
Next Video
SPONSORED BY The Market Online