Not sure I agree here, on 1 or 2 holes yes for sure but if they start showing 10-20 holes all with same grade and continuity as the main deposit in a new area then I think the market will go crazy over that.
You need to think about what adding 10 years to the mine life would do to the valuation. We are being valued on US 1b NPV currently.. imagine adding another 10 years of $200-250m per year cash flow ontop of that into the equation.
- Forums
- ASX - By Stock
- Ann: US$244.5M Proposed Project Finance Package
Not sure I agree here, on 1 or 2 holes yes for sure but if they...
-
- There are more pages in this discussion • 46 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.36 |
Change
0.040(1.20%) |
Mkt cap ! $940.5M |
Open | High | Low | Value | Volume |
$3.31 | $3.43 | $3.27 | $1.940M | 577.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | $3.35 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.40 | 1118 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 3.350 |
2 | 1168 | 3.330 |
1 | 418 | 3.320 |
1 | 418 | 3.310 |
3 | 870 | 3.300 |
Price($) | Vol. | No. |
---|---|---|
3.400 | 418 | 1 |
3.410 | 418 | 1 |
3.420 | 418 | 1 |
3.430 | 10918 | 3 |
3.440 | 418 | 1 |
Last trade - 16.10pm 17/09/2024 (20 minute delay) ? |
Featured News
ADT (ASX) Chart |