The cost to install the already purchased Alevo equipment (pouch & prismatic) and organise new cylindrical cell machinery is estimated at around the US$52M mark (likely includes some contingency). This is to have the 1+GW Imperium3 NY facility up and running producing cells of which Magnis owns around 47%.
Fortunately we don't need to construct a building to house the facility saving quite a bit of time and money. Huron is already set up to handle this sort of manufacturing business.
Compare that to Avanze which is looking to build a similar 1GW cell manufacturing facility and that they have estimated will cost them US$256M to build!
IMO Imperium3 will likely get the 1GW NY facility up and running for around a quarter of the cost of AvanzeThis will have a huge positive impact on profitability as the bond/loan repayment will be much smaller and easier to pay back.
- Forums
- ASX - By Stock
- MNS
- Ann: US$52M Term Sheet Signed for New York Battery Plant
Ann: US$52M Term Sheet Signed for New York Battery Plant, page-168
-
- There are more pages in this discussion • 330 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNS (ASX) to my watchlist
|
|||||
Last
4.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $50.37M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MNS (ASX) Chart |
Day chart unavailable