They should have moved on the solar-hybrid facility at Goulamina from the get-go.
Other big mines in Mali have - we could have cut n paste those systems into Goulamina development and had it ready to go by June. They are Bulider-owner-operator so no capex cost to us upfront and at a good power supply price. I really can't understand why that didn't happen other than Simon being a boomer.
- Forums
- ASX - By Stock
- LLL
- Ann: US$65m for 5% sale of Goulamina and Continued Suspension
Ann: US$65m for 5% sale of Goulamina and Continued Suspension, page-393
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $605.4M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
SPONSORED BY The Market Online