Interesting that Entergy went through an EPC supplied rather than directly to Pointerra who they already use, but perhaps that relates to them wanting a more comprehensive solution (i.e. fixing the poles that have been identified as needed the work).
What is more interesting is that this resilience program has been on a cards for some time, and why the release today in advance of of the 4C.....it's not like they have settled on a price or timelines etc, but almost as if mgmt want the speculation that we are seeing above.....$20-$40 at 4m poles means $80m-$160m in revenues (although as someone pointed out, nothing around survey costs, hosting costs, profitability etc).
Look great to have this, but as usual, a lot more questions than answers and invariably, none of this matters unless it results in net cash in the bank.....history would indicate that the 4c will be a reality chack and mgmt will flag revenues are coming somewhere down the line (but just not clear when!)
- Forums
- ASX - By Stock
- 3DP
- Ann: US Energy Utility CAPEX Program
Ann: US Energy Utility CAPEX Program, page-25
-
- There are more pages in this discussion • 103 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 3DP (ASX) to my watchlist
|
|||||
Last
6.4¢ |
Change
0.002(3.23%) |
Mkt cap ! $49.91M |
Open | High | Low | Value | Volume |
6.5¢ | 6.5¢ | 6.4¢ | $15.64K | 241.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6419 | 6.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.3¢ | 100009 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6419 | 0.062 |
1 | 28917 | 0.061 |
2 | 400000 | 0.060 |
2 | 550864 | 0.059 |
1 | 16000 | 0.058 |
Price($) | Vol. | No. |
---|---|---|
0.063 | 100000 | 1 |
0.064 | 964969 | 1 |
0.066 | 3356 | 1 |
0.068 | 45000 | 1 |
0.069 | 224492 | 3 |
Last trade - 09.59am 29/07/2024 (20 minute delay) ? |
Featured News
3DP (ASX) Chart |