We anticipate well flow testing operations will commence around 10 August, once sufficient flow back of stimulation fluids has been achieved.During testing activities, a Production Logging Tool (PLT) will be run into the hole to determine the gas contribution from each of the stimulated zones. The well will then be cycled through equal periods of shut-in and flow at various flow rates. This will be followed by an extended flow test of around two days, during which time gas samples will be taken at stable gas flow conditions. The gas samples will then be sent to a laboratory for accurate analysis of the composition of the gas. Once samples have been taken, the well will be shut-in to observe the pressure response of the reservoir.
- Forums
- ASX - By Stock
- MEL
- Ann: Vali flow-back program update
MEL
metgasco ltd
Add to My Watchlist
0.00%
!
0.2¢

Ann: Vali flow-back program update, page-16
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.665M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.2¢ | $7.983K | 3.511M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 9832429 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 11398095 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 9832429 | 0.002 |
8 | 35000998 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 11398095 | 12 |
0.004 | 10479052 | 6 |
0.006 | 311675 | 1 |
0.020 | 15085 | 1 |
0.022 | 91666 | 1 |
Last trade - 11.48am 26/06/2025 (20 minute delay) ? |
Featured News
MEL (ASX) Chart |
The Watchlist
3DA
AMAERO LTD
Hank Holland, Chairman & CEO
Hank Holland
Chairman & CEO
Previous Video
Next Video
SPONSORED BY The Market Online