Re Further ProjectThe laterite is part of the 227,140t total so...

  1. 3,667 Posts.
    lightbulb Created with Sketch. 7585

    Re Further Project
    The laterite is part of the 227,140t total so if the laterite is mined, the further projects reduce to 208,400t (Probably +/- quite a lot).
    https://hotcopper.com.au/data/attachments/7067/7067865-3d03ce274a445bd72ececdf2e9f084ed.jpg

    The JORC resource above considers the existing pits and puts a 0 grade to that physical location.

    The Tasman pit cross section shows some reasonably well drilled ore within the Transitional zone between oxide and Fresh rock (between the two pink lines) that is just below the existing pit bottom. Given the drilling undertaken, this area below the Tasman pit is most likely part of the 291,000t @ 1.1g/t.

    If the Tasman pit is extended to the east it would be mining part of the 227,140t resource rather than being something incremental.
    https://hotcopper.com.au/data/attachments/7067/7067869-ec0ede99469417d57e0bb37f42017678.jpg
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
11.5¢
Change
0.005(4.55%)
Mkt cap ! $9.274M
Open High Low Value Volume
11.0¢ 12.0¢ 11.0¢ $30.08K 263.4K

Buyers (Bids)

No. Vol. Price($)
1 10974 11.5¢
 

Sellers (Offers)

Price($) Vol. No.
12.0¢ 60872 2
View Market Depth
Last trade - 15.45pm 13/06/2025 (20 minute delay) ?
TG6 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.