They undertook a trial sized operation and had plans for a much...

  1. 3,671 Posts.
    lightbulb Created with Sketch. 7587
    They undertook a trial sized operation and had plans for a much larger production sized operation. They never paid the fees to the regulators for those plans and they weren't implemented. What we see on the ground and what TG6 is drilling is the ore put through that trial so it has a grade that is reduced by what-ever the trial recovered.

    The laterite ore within that trial was estimated to have a grade of 1.85g/t:
    • If the leach operation took 70% of the gold then the pile is at ~0.56g/t
    • If the leach operation took 60% of the gold then the pile is at ~0.74g/t
    • If the leach operation took 50% of the gold then the pile is at ~0.93g/t
    • If the leach operation took 40% of the gold then the pile is at ~1.11g/t
    • If the leach operation took 30% of the gold then the pile is at ~1.30g/t

    Given there was no production leach pad (i.e. no profit in doing so), its most likely they didn't get 60% or 70% recoveries. The recovery rate could be 50% or lower. This puts the residual grade that's there well into the grades that is commercial to toll treat.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
11.5¢
Change
0.000(0.00%)
Mkt cap ! $9.274M
Open High Low Value Volume
11.5¢ 11.5¢ 11.5¢ $5.375K 46.73K

Buyers (Bids)

No. Vol. Price($)
3 326110 11.0¢
 

Sellers (Offers)

Price($) Vol. No.
11.5¢ 18680 1
View Market Depth
Last trade - 15.26pm 16/06/2025 (20 minute delay) ?
TG6 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.