It does state "Total project value".
Allow a couple of thousand for shipping. I have friends living off the grid due to the high cost of having power installed, ie connected to the grid. One such family needed to run power around 2km and the cost was going to be close to 30k. That is just to get supply so 164k for a system that can generate and store power seems extremely reasonable.
- Forums
- ASX - By Stock
- AVL
- Ann: Vanadium Energy Storage Installation-AVL.AX
Ann: Vanadium Energy Storage Installation-AVL.AX, page-35
-
-
- There are more pages in this discussion • 125 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $120.8M |
Open | High | Low | Value | Volume |
1.4¢ | 1.5¢ | 1.4¢ | $30.45K | 2.139M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
18 | 15168316 | 1.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.5¢ | 14137892 | 48 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 11942316 | 0.014 |
27 | 7747068 | 0.013 |
22 | 6217085 | 0.012 |
10 | 4327381 | 0.011 |
15 | 8055095 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.015 | 10869301 | 44 |
0.016 | 16523024 | 21 |
0.017 | 7022166 | 19 |
0.018 | 4564118 | 11 |
0.019 | 3805249 | 6 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
AVL (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online