low grade stockpiles in first year probably to save losing metal in high grade while they are on the learning curve. ie plant recoveries also need time to ramp up to nameplate %s in the polymetallic ore.
- Forums
- ASX - By Stock
- Ann: Vares Project Production Guidance & Update
low grade stockpiles in first year probably to save losing metal...
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ADT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.67 |
Change
0.080(1.74%) |
Mkt cap ! $1.219B |
Open | High | Low | Value | Volume |
$4.67 | $4.70 | $4.56 | $2.794M | 601.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
14 | 4021 | $4.67 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.68 | 2127 | 13 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
13 | 3876 | 4.670 |
17 | 5196 | 4.660 |
16 | 11835 | 4.650 |
9 | 4232 | 4.640 |
7 | 2767 | 4.630 |
Price($) | Vol. | No. |
---|---|---|
4.680 | 1973 | 11 |
4.690 | 6796 | 12 |
4.700 | 90338 | 11 |
4.710 | 10142 | 6 |
4.720 | 4392 | 6 |
Last trade - 14.49pm 16/05/2024 (20 minute delay) ? |
|
|||||
Last
$4.68 |
  |
Change
0.080 ( 2.17 %) |
|||
Open | High | Low | Volume | ||
$4.59 | $4.70 | $4.56 | 100651 | ||
Last updated 15.10pm 16/05/2024 ? |
Featured News
ADT (ASX) Chart |