Ann: VEN: Vali-2 successful and cased for future production, page-8

  1. 4,941 Posts.
    lightbulb Created with Sketch. 2326
    I would think that both the Toolachee and the Patchawarra would be fracked to maximize production .

    So sure to fracc and flow test the Patchawarra in their Testing Campaign but possibly not the Toolachee unless they planned a dual completion .

    May leave the Toolachee fracc and test till later in the fields life after depletion of the Patchawarra ???
    Great that they got a flow and gas sample from the Toolachee though.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $3.674M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
8 6630498 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 10343632 7
View Market Depth
Last trade - 16.21pm 28/07/2025 (20 minute delay) ?
MEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.