Thanks J for clarifying. Certainly a lot more detail than I was aware of and gives any potential investors some insight of the bigger picture. One of the more constructive post for months.
My thoughts on running the two operations simultaneously was to ensure the plant was as near to nameplate as possible. As I remember Riley was having problems with roots/sticks and clay etc. and therefore was hindering the processing speed and increasing costs. We also were aiming for two shipping's per month.
Running both sites at the simultaneously would speed up production at Riley and reduce logistic issues between Livingstone and Riley.
Only my opinion as an armchair mining voyeur. Or dreamer? At the end of the day it's fairly moot points as it's all in the hands of the fat controller.
- Forums
- ASX - By Stock
- CRI
- Ann: Venture expands REE strategy with new priority targets in WA
Ann: Venture expands REE strategy with new priority targets in WA, page-68
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CRI (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.001(8.33%) |
Mkt cap ! $34.72M |
Open | High | Low | Value | Volume |
1.2¢ | 1.3¢ | 1.2¢ | $56.26K | 4.684M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 421924 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 1019226 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 421924 | 0.012 |
29 | 8938816 | 0.011 |
14 | 5209595 | 0.010 |
5 | 3468413 | 0.009 |
5 | 3788750 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 1019226 | 6 |
0.014 | 1750000 | 3 |
0.015 | 1471102 | 5 |
0.016 | 1750000 | 3 |
0.017 | 1196699 | 5 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
CRI (ASX) Chart |