still waiting for the assays from the renison style sequence that started last march after they finished the “metallurgical hole”. Drilling one shift per day till being diverted to REE drilling. These aren’t the only holes that are MIA. Not sure what lab we are using but man its slow and always has been. Looking for results is also made more difficult by not reporting as other companies do with a list of drills on a map with drill holes and what is a result and what is pending. So much cut and paste waffle in every announcement its hard to wade through, you would almost think it’s deliberate. Might do a list to send Samso to ask about in his next interview as I’ve received no reply.
- Forums
- ASX - By Stock
- Ann: Venture set to drill at the Iron Duke High Grade REE Project
still waiting for the assays from the renison style sequence...
-
-
- There are more pages in this discussion • 113 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CRI (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $32.06M |
Open | High | Low | Value | Volume |
1.2¢ | 1.2¢ | 1.2¢ | $4.426K | 368.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 4443069 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.2¢ | 5327264 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 4443069 | 0.011 |
21 | 7184273 | 0.010 |
10 | 4329746 | 0.009 |
3 | 3100000 | 0.008 |
4 | 7871428 | 0.007 |
Price($) | Vol. | No. |
---|---|---|
0.012 | 5327264 | 9 |
0.013 | 5281810 | 15 |
0.014 | 1428553 | 5 |
0.015 | 4020984 | 5 |
0.016 | 3080000 | 3 |
Last trade - 15.57pm 18/10/2024 (20 minute delay) ? |
Featured News
CRI (ASX) Chart |