ECT 20.0% 0.2¢ environmental clean technologies limited.

Ann: Victorian Coal Upgrade Feasibility Study Commences, page-2

  1. 2,556 Posts.
    lightbulb Created with Sketch. 468
    EnergyAustralia’ to host the site at Yallourn Power Station


     Feasibility study commencing targeted for completion by March 2019.

    Redesign of the original core design to support 600,000 tonnes per annum (tpa)
 
watchlist Created with Sketch. Add ECT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.