generally a mechanical issue related with either the rams or seals on the BOP. If its not maintaining pressure then its not sealing well.
The one on the rig should b rated at 10/15000 psi, see link for specs.
I don't blame ENI for not drilling ahead, safety matters more in this sector.
http://www.enscoplc.com/Theme/Ensco/files/docs_rigspecs/ENSCO%20107.pdf
- Forums
- ASX - By Stock
- NEN
- Ann: Vietnam - Cua Lo-1 Drilling Update
Ann: Vietnam - Cua Lo-1 Drilling Update , page-16
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NEN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online