generally a mechanical issue related with either the rams or seals on the BOP. If its not maintaining pressure then its not sealing well.
The one on the rig should b rated at 10/15000 psi, see link for specs.
I don't blame ENI for not drilling ahead, safety matters more in this sector.
http://www.enscoplc.com/Theme/Ensco/files/docs_rigspecs/ENSCO%20107.pdf
- Forums
- ASX - By Stock
- Ann: Vietnam - Cua Lo-1 Drilling Update
generally a mechanical issue related with either the rams or...
-
- There are more pages in this discussion • 47 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)