the deleterious elements in ionic clays generally aren't locked in the lattice of the host that the REO exist.
therefore when processing the uranium and thorium isn't concentrated linearly with the TREO. It effectively is dropped out in the early parts of the process circuit and exists at the low ppm levels it was extracted at (NORM).
Hard rock projects generally need dedicated storage facilities to house the waste material which contains the thorium and uranium.
Most of the poor environment practices typically synonymous with ionic relate back to insitu leaching as a process methodology and poor rehabilitation. Vat tank leaching or heap leaching avoids in-situ leaching.
Then it just requires adequate rehabilitation for the processed material. both ixr, serra verde, tantalus, aclara penco have good literature within their studies or in the form of ESIA or EHIA which delineates the specifics of this.
SF2TH
- Forums
- ASX - By Stock
- VMM
- Ann: Viridis Secures Pivotal Southern Complex Expansion
Ann: Viridis Secures Pivotal Southern Complex Expansion, page-33
-
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VMM (ASX) to my watchlist
(20min delay)
|
|||||
Last
91.0¢ |
Change
0.035(4.00%) |
Mkt cap ! $58.47M |
Open | High | Low | Value | Volume |
88.0¢ | 92.0¢ | 85.5¢ | $263.8K | 293.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 25387 | 91.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
92.0¢ | 5069 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 25387 | 0.910 |
1 | 2207 | 0.905 |
1 | 10000 | 0.900 |
1 | 50000 | 0.885 |
1 | 2352 | 0.850 |
Price($) | Vol. | No. |
---|---|---|
0.920 | 69 | 1 |
0.925 | 3120 | 1 |
0.940 | 3389 | 1 |
0.950 | 42315 | 3 |
1.000 | 51298 | 2 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
VMM (ASX) Chart |