IMO
You can barge heavy equipment in summer if needed on top of ice road winter use.
As there are two options.
And then
Ore sort then barge this sorted ore to Hay River then rail rest and or truck to SRC depot for the extraction phase.
Not investment advice, do your own research, and consult a licensed adviser
- Forums
- ASX - By Stock
- Ann: Vital Metals Commences Mining Operations Ahead of Production
IMO You can barge heavy equipment in summer if needed on top of...
- There are more pages in this discussion • 124 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VML (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.001(25.0%) |
Mkt cap ! $29.47M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.5¢ | $7.931K | 1.613M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
55 | 22028380 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 7420583 | 35 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
46 | 18246226 | 0.004 |
42 | 37014469 | 0.003 |
11 | 29350125 | 0.002 |
8 | 70895201 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 7305199 | 34 |
0.006 | 10816322 | 38 |
0.007 | 5838722 | 13 |
0.008 | 14024284 | 6 |
0.009 | 4420049 | 9 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
0.5¢ |
  |
Change
0.001 ( 25.0 %) |
|||
Open | High | Low | Volume | ||
0.5¢ | 0.5¢ | 0.5¢ | 210324 | ||
Last updated 14.43pm 03/05/2024 ? |
Featured News
VML (ASX) Chart |