use your brain, CDR was completed in October 2018.
This report shows costs incurred to 30/6/18
How do they incur construction costs to 30/6/18, prior to the CDR being completed? Explain that to me
A Critical Design Review (CDR) is a multi-disciplined technical review to ensure that a system can proceed into fabrication, demonstration, and test and can meet stated performance requirements within cost, schedule, and risk.
SAS Price at posting:
5.4¢ Sentiment: Hold Disclosure: Not Held