NEO nuenco nl

sadly folks, page-2

  1. 1,217 Posts.
    lightbulb Created with Sketch. 275
    God forbid. Never let it be said.
    I, for one, am not yet convinced.

    If we take part of Kain's words -"It is our belief that the
    strong flow rates from these wells will go a long way
    towards filling the initial target for the field set by the
    operator of 6 000 000 cubic field a day (i.e. 6,000 mcf/d)"

    then it is my belief that the critical word is "initial".

    The final daily flow rates will depend on how much gas
    is down there and on how many more wells they are
    prepared to drill. Clearly NEO needs short term cash
    so it is not unreasonable to expect them to connect
    up existing wells to a gas pipeline before going ahead
    and drilling more wells.
 
watchlist Created with Sketch. Add NEO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.