VTX 3.13% 16.5¢ vertex minerals limited

Ann: VTX to Incorporate TOMRA Ore Sorter at Reward Gold Plant, page-2

  1. 1,076 Posts.
    lightbulb Created with Sketch. 172
    Wow....Bring on 2025!!

    94kg of sample from the low-grade stockpile at Reward Gold Mine (Reward) was sorted. The following
    results are reported;
    ü Head grade to Sorter weighted average grade (WAG) = 3.70 g/t gold,
    ü Ore grade WAG after sorting = 16.22g/t gold (337.20% increase on grade),
    ü Ore/waste split after sorting = 19.31kgs Ore vs 74.54kgs Waste (79% mass reduction),
    ü Gold lost to waste fraction = 0.03grams/t (>90% efficiency).
 
watchlist Created with Sketch. Add VTX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.