WAF 0.68% $1.47 west african resources limited

In this case the sulphide ore is not refractory so the capital...

  1. 4,303 Posts.
    lightbulb Created with Sketch. 1876
    In this case the sulphide ore is not refractory so the capital costs are relatively modest at US$170M to add a 4.4Mtpa processing train. If they had to build it from scratch it'd be a lot higher cost, but having an existing oxide plant helps bring the new plant cost down.
 
watchlist Created with Sketch. Add WAF (ASX) to my watchlist
(20min delay)
Last
$1.47
Change
-0.010(0.68%)
Mkt cap ! $1.666B
Open High Low Value Volume
$1.45 $1.47 $1.44 $2.913M 2.004M

Buyers (Bids)

No. Vol. Price($)
4 89729 $1.45
 

Sellers (Offers)

Price($) Vol. No.
$1.47 54718 3
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
WAF (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.