Here the short version:
- The current rate of 20 TJ/d is the daily minimum obligation from the initial GSA with Santos WA.
- Walyering wells are fully brought to production and the facility can deliver at least a rate of 33 TJ/d.
- The new GSA with Alinta Energy will increase our daily production by about 9-10 TJ/d starting from Feb.
- Current daily production of 20 TJ is due to the optimization of the Walyering gas sales value.
- Production capacity of the facility can be expanded above 33 TJ/d.
ok? (love your comments)
- Forums
- ASX - By Stock
- Ann: Walyering Production Update
:)Here the short version: The current rate of 20 TJ/d is the...
-
- There are more pages in this discussion • 92 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
|
|||||
Last
25.0¢ |
Change
0.015(6.38%) |
Mkt cap ! $715.1M |
Open | High | Low | Value | Volume |
24.0¢ | 25.0¢ | 23.8¢ | $3.385M | 13.78M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 369888 | 24.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
25.0¢ | 472851 | 17 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 74484 | 0.245 |
37 | 797567 | 0.240 |
12 | 964420 | 0.235 |
13 | 482522 | 0.230 |
3 | 63917 | 0.225 |
Price($) | Vol. | No. |
---|---|---|
0.250 | 472851 | 17 |
0.255 | 1034120 | 15 |
0.260 | 1190892 | 19 |
0.265 | 205870 | 8 |
0.270 | 106876 | 5 |
Last trade - 16.10pm 27/06/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |