Here the short version:
- The current rate of 20 TJ/d is the daily minimum obligation from the initial GSA with Santos WA.
- Walyering wells are fully brought to production and the facility can deliver at least a rate of 33 TJ/d.
- The new GSA with Alinta Energy will increase our daily production by about 9-10 TJ/d starting from Feb.
- Current daily production of 20 TJ is due to the optimization of the Walyering gas sales value.
- Production capacity of the facility can be expanded above 33 TJ/d.
ok? (love your comments)
- Forums
- ASX - By Stock
- Ann: Walyering Production Update
:)Here the short version: The current rate of 20 TJ/d is the...
- There are more pages in this discussion • 92 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
|
|||||
Last
20.0¢ |
Change
-0.005(2.44%) |
Mkt cap ! $572.1M |
Open | High | Low | Value | Volume |
20.5¢ | 20.5¢ | 19.5¢ | $974.2K | 4.841M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 481681 | 20.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.5¢ | 811574 | 13 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 127592 | 0.200 |
38 | 2287722 | 0.195 |
47 | 2561769 | 0.190 |
29 | 1144918 | 0.185 |
34 | 1211214 | 0.180 |
Price($) | Vol. | No. |
---|---|---|
0.205 | 811574 | 13 |
0.210 | 3542088 | 18 |
0.215 | 239667 | 10 |
0.220 | 789039 | 24 |
0.225 | 1223644 | 15 |
Last trade - 16.10pm 17/06/2024 (20 minute delay) ? |
|
|||||
Last
20.0¢ |
  |
Change
-0.005 ( 1.04 %) |
|||
Open | High | Low | Volume | ||
20.3¢ | 20.5¢ | 19.8¢ | 2500820 | ||
Last updated 15.59pm 17/06/2024 ? |
Featured News
STX (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online