STX 2.56% 19.0¢ strike energy limited

Hi gimo,Generally you design for a 10% margin to the facility,...

  1. 18 Posts.
    lightbulb Created with Sketch. 31
    Hi gimo,

    Generally you design for a 10% margin to the facility, so I'd expect the max capacity to be around 36 TJ/d.
    Any flowrates higher than that will lead to degradation of equipment, piping, valves, etc.

    The reserve base isn't large enough to justify another production train so it's all about plant optimisation to increase production.

    All imho.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
19.0¢
Change
-0.005(2.56%)
Mkt cap ! $543.5M
Open High Low Value Volume
19.0¢ 19.5¢ 19.0¢ $967.9K 5.061M

Buyers (Bids)

No. Vol. Price($)
31 1519097 19.0¢
 

Sellers (Offers)

Price($) Vol. No.
19.5¢ 564238 8
View Market Depth
Last trade - 16.10pm 07/06/2024 (20 minute delay) ?
Last
19.0¢
  Change
-0.005 ( 2.01 %)
Open High Low Volume
19.3¢ 19.5¢ 19.0¢ 1551771
Last updated 15.59pm 07/06/2024 ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.