STX 2.13% 24.0¢ strike energy limited

Gas flaring resumed = good news…. :)Testing schedule was:1....

  1. 1,825 Posts.
    lightbulb Created with Sketch. 2776
    Gas flaring resumed = good news….

    Testing schedule was:

    1. Perforating D-, C-, and B-Sand
    2. Flow testing D-Sand (5m perforation)
    3. Flow testing C-Sand (8m)
    4. Flow testing B-Sand (13m)
    5. Perforating 6m of the Cadda Fmt.
    6. Cadda Fmt. extended flow test

    Perhaps the Cadda testing commenced after the necessary perforation of this structure?

    The Cadda is an unexpected additional discovery but I really hope that the structures intersected in W5 are connected with those intersected in W6…

    Walyering will be a wonderful earner for both JV partners very soon…


    Last edited by gimo211: 18/07/22
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
24.0¢
Change
0.005(2.13%)
Mkt cap ! $686.9M
Open High Low Value Volume
23.5¢ 24.3¢ 23.0¢ $2.375M 10.01M

Buyers (Bids)

No. Vol. Price($)
7 397363 23.5¢
 

Sellers (Offers)

Price($) Vol. No.
24.0¢ 496987 6
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
24.0¢
  Change
0.005 ( 2.13 %)
Open High Low Volume
23.0¢ 24.0¢ 23.0¢ 4094689
Last updated 15.59pm 10/05/2024 ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.