  1. V8
    10,794 Posts.
    lightbulb Created with Sketch. 204
    Correct, from Dec 21 they only fracced the bottom half and it was a small frac

    "In both Warro 5 and 6 wells, the first smulaon stage was intentionally small to
    provide calibraon informaon for subsequent, larger stages.
    At Warro-6, three stages of reservoir smulaon resulted in the successful emplacement of over 715,000 pounds (325,000kg) of proppant. Only the deeper
    50% of the gross reservoir secon was targeted by these three stages. Inial flow
    back operaons commenced at Warro-6 on December 17 and resulted in the
    recovery of a substanal poron of the smulaon fluids"

    Dunno what happen in the cut and paste but you get the idea, we can effectively double whatever they report as flow rates, if that number gets to 3mm cfd its bollonger time. Were at 2.6 and rising in the first days, this is likely to increase for weeks to come.
 