MXR 3.23% 3.0¢ maximus resources limited

Ann: Wattle Dam Gold Project Resource increases by 250%, page-2

  1. 1,016 Posts.
    lightbulb Created with Sketch. 533
    Wowee.
    Great update. Huge increase and that’s even with the cut off grade being increased from 0.3gt to 0.5gt.
    I wasn’t expecting that.
 
watchlist Created with Sketch. Add MXR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.