Basically the difference between the above figures 2,500bpd to 20,000bpd is the permeability
2500 is limited by reservoir permeability and oil flow from reservoir into the well bore
20000 is limited by production string dynamic pressure losses associated with flow rates.
The key is to unlock the inherent permeability that exists in the deep stuff. It might be tough to do it but when they do and they will do it; Alameda and Marti will flow like the clappers!
- Forums
- ASX - By Stock
- MAY
- Ann: Webinar for Block 9 Update
Ann: Webinar for Block 9 Update, page-278
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MAY (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.0¢ |
Change
-0.002(9.09%) |
Mkt cap ! $67.40M |
Open | High | Low | Value | Volume |
2.2¢ | 2.2¢ | 2.0¢ | $31.42K | 1.518M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
32 | 8153107 | 2.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 443000 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.021 |
30 | 7963107 | 0.020 |
10 | 1075920 | 0.019 |
4 | 386230 | 0.018 |
5 | 280355 | 0.017 |
Price($) | Vol. | No. |
---|---|---|
0.020 | 50478 | 2 |
0.021 | 593000 | 4 |
0.022 | 2827048 | 10 |
0.023 | 3100000 | 4 |
0.024 | 2494362 | 7 |
Last trade - 16.10pm 08/08/2024 (20 minute delay) ? |
Featured News
MAY (ASX) Chart |