For the ZBM3, yes that is what I heard too, need around 80 MWh of production per annum for profitability. I vaguely recall something along the lines of beyond 40 MWh will need more investment.
I can seen why the X10 and production in a robotic factory producing for larger installations is the way we need to go.
Also clarifies why, outside of Operational Expenses, if the CR doesn't get beyond 50% Thailand gets no investment, the larger percentage of the raised funds goes to X10 Engineering.
From page 14 of https://wcsecure.weblink.com.au/pdf/RFX/02798504.pdf
- Forums
- ASX - By Stock
- RFX
- Ann: Webinar notification
Ann: Webinar notification, page-9
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RFX (ASX) to my watchlist
(20min delay)
|
|||||
Last
10.0¢ |
Change
0.001(1.01%) |
Mkt cap ! $26.42M |
Open | High | Low | Value | Volume |
10.0¢ | 10.3¢ | 9.9¢ | $31.98K | 319.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 228335 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 74351 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 228335 | 0.100 |
11 | 215222 | 0.099 |
7 | 113275 | 0.098 |
3 | 120300 | 0.097 |
2 | 415000 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 74351 | 4 |
0.110 | 421500 | 4 |
0.115 | 153105 | 4 |
0.120 | 248882 | 6 |
0.130 | 4103 | 2 |
Last trade - 16.10pm 03/06/2024 (20 minute delay) ? |
|
|||||
Last
10.3¢ |
  |
Change
0.001 ( 2.38 %) |
|||
Open | High | Low | Volume | ||
10.0¢ | 10.3¢ | 9.7¢ | 300136 | ||
Last updated 15.52pm 03/06/2024 ? |
Featured News
RFX (ASX) Chart |