So one of the many milestones pushes out by a quarter for a company that has brought its technology along faster than any other semiconductor company and has been exceedingly reliable to boot in its timelines in most circumstances.
And you are calling the share apocalypse?
I'd much rather a production fab qualification gets it right than have the alternative of not even getting off the lab bench due to too much variability. We want the situation where a chip designer can just drag and drop our memory onto their eCAD designs and know it will work well when produced the first time.
Good production qualification will do that for us and if it takes some time so be it.
- Forums
- ASX - By Stock
- Ann: Weebit presentation on technical and commercial progress
So one of the many milestones pushes out by a quarter for a...
-
- There are more pages in this discussion • 138 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WBT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.87 |
Change
0.000(0.00%) |
Mkt cap ! $353.2M |
Open | High | Low | Value | Volume |
$1.87 | $1.90 | $1.84 | $1.069M | 570.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 14022 | $1.87 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.88 | 18954 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 272 | 1.845 |
2 | 4840 | 1.840 |
2 | 43749 | 1.835 |
3 | 2595 | 1.830 |
2 | 9369 | 1.825 |
Price($) | Vol. | No. |
---|---|---|
1.900 | 2230 | 1 |
1.910 | 73500 | 1 |
1.915 | 1063 | 1 |
1.920 | 46500 | 2 |
1.930 | 1650 | 2 |
Last trade - 16.10pm 20/09/2024 (20 minute delay) ? |
Featured News
WBT (ASX) Chart |