Ungani 5 – Weekly Drilling Report
Buru Energy Limited (Buru Energy) provides the following weekly update on drilling operations at the Ungani 5 appraisal well as at 06:00 hours Tuesday 5 December 2017.
Since the last report the well has been drilled ahead in 12¼ inch (311 mm) surface hole to the first casing setting depth of 918 metres. The current operation is preparing to run 9⅝ inch (244mm) casing.
The well is being drilled by the DDGT1 rig to a prognosed total depth of approximately 2,200 metres, and is expected to take 33 days to drill and complete. The well is located some 1,140 metres to the east of Ungani 1 on a separate drilling pad and is designed to appraise the oil pool discovered by the Ungani 3 well
Drone video footage of the DDGT1 drilling operations at Ungani and other Buru activity can be viewed on Buru Energy’s website.
- Forums
- ASX - By Stock
- BRU
- Ann: Weekly Drilling Report - Ungani 5
Ann: Weekly Drilling Report - Ungani 5, page-2
- There are more pages in this discussion • 33 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BRU (ASX) to my watchlist
|
|||||
Last
8.6¢ |
Change
-0.005(5.49%) |
Mkt cap ! $57.73M |
Open | High | Low | Value | Volume |
8.9¢ | 8.9¢ | 8.6¢ | $16.81K | 191.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 254 | 8.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.9¢ | 225741 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 254 | 0.086 |
2 | 7176 | 0.085 |
1 | 12048 | 0.083 |
2 | 12907 | 0.082 |
2 | 110000 | 0.081 |
Price($) | Vol. | No. |
---|---|---|
0.090 | 1109855 | 2 |
0.092 | 647674 | 3 |
0.094 | 149969 | 3 |
0.095 | 75000 | 3 |
0.097 | 173913 | 1 |
Last trade - 16.10pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
8.7¢ |
  |
Change
-0.005 ( 3.01 %) |
|||
Open | High | Low | Volume | ||
8.7¢ | 8.7¢ | 8.6¢ | 16424 | ||
Last updated 15.32pm 14/06/2024 ? |
Featured News
BRU (ASX) Chart |