STX 0.00% 19.5¢ strike energy limited

Ann: West Erregulla 2 Update, page-3

  1. 458 Posts.
    lightbulb Created with Sketch. 9

    Highlights
    • Second intermediate section cased and cemented
    • Preparing to run in hole and drill ahead to primary targets

    Since the last update, Strike has successfully run in hole with the 8-5/8” casing liner to a setting depth of4,226m and cemented this in place to finish the second intermediate section. Liner running and cementingactivities proceeded smoothly and the hole section is now cased. The cement shoe track was then drilled outand a leak off test performed.

    Forward Plan
    Strike is currently pulling out of hole with the shoe track assembly and will then conduct a cement bond log(CBL) in the cased hole section. Following the CBL, a new bottom hole assembly with motor will be run intothe hole to commence drilling the 6-3/4” production hole section to a nominal TD of 5,200m.Within this final section, Strike prognoses it will intersect a further Wagina sand cycle before entering theCarynginia Shale and then proceeding through the Irwin River Coal Measures to the first primary gas targetin the Kingia sandstone. After the Kingia, a shale separates the second primary gas target in the High Cliffsandstone before the well reaches TD.

    West Erregulla-2
    West Erregulla-2 is being drilled in EP 469, which is adjacent to and targeting analogous Permian gas sandsof a similar size and nature as the Waitsia gas discovery. The well will be drilled to a planned total depth of5,200m.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
19.5¢
Change
0.000(0.00%)
Mkt cap ! $558.7M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 2720 22.0¢
 

Sellers (Offers)

Price($) Vol. No.
18.5¢ 40553 2
View Market Depth
Last trade - 16.20pm 30/08/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.