STX 0.00% 22.0¢ strike energy limited

To flow test other zones, you are correct - tubing out and perf...

  1. 120 Posts.
    lightbulb Created with Sketch. 31
    To flow test other zones, you are correct - tubing out and perf other zones.

    Surface facilities will include;
    - Choke
    - Chen injection skid (methanol for de-icing, corrosion inhibitor, scale inhibitor)
    - Metering
    - Liquids handling if required (but not expected IMO)

    Pipeline will be around 1.5-2 years due to;
    - regulatory approvals process
    - linepipe lead time of 6 months
    - pig trap closures might be up to 6 months too
    Construction of that line would only be a month.

 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
22.0¢
Change
0.000(0.00%)
Mkt cap ! $629.6M
Open High Low Value Volume
22.0¢ 22.5¢ 21.5¢ $1.075M 4.892M

Buyers (Bids)

No. Vol. Price($)
6 491938 21.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.0¢ 41858 1
View Market Depth
Last trade - 16.10pm 30/04/2024 (20 minute delay) ?
Last
22.0¢
  Change
0.000 ( 0.23 %)
Open High Low Volume
22.5¢ 22.5¢ 21.5¢ 1288173
Last updated 16.05pm 30/04/2024 ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.