so for those who know about these things - what happens next once the 3 1/2 tubing string and completion assembly are installed and the Kingia is flow tested? Do we need to pull all of that out of the hole in order to perforate each of the other two sections and flow test them?
What surface production facilities will we need, what's the likely cost, and how long to establish these and build the pipeline to tie into the DBGP - what approvals are needed. Is there spare capacity in the DBGP to take the sort of quantities of gas we could be capable of producing? I imagine we'll be doing all the flow testing work on the Wagina and High Cliff while that's being sorted out - is that correct?
- Forums
- ASX - By Stock
- STX
- Ann: West Erregulla 2 Update
Ann: West Erregulla 2 Update, page-19
- There are more pages in this discussion • 150 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $586.4M |
Open | High | Low | Value | Volume |
20.5¢ | 20.5¢ | 19.5¢ | $1.799M | 8.954M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
13 | 667539 | 20.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.5¢ | 506260 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 292777 | 0.200 |
28 | 1810758 | 0.195 |
44 | 2593275 | 0.190 |
28 | 1273918 | 0.185 |
31 | 1854414 | 0.180 |
Price($) | Vol. | No. |
---|---|---|
0.205 | 138572 | 5 |
0.210 | 2972622 | 13 |
0.215 | 299667 | 11 |
0.220 | 774022 | 24 |
0.225 | 1338644 | 17 |
Last trade - 16.10pm 14/06/2024 (20 minute delay) ? |
|
|||||
Last
20.3¢ |
  |
Change
0.000 ( 0.75 %) |
|||
Open | High | Low | Volume | ||
20.3¢ | 20.5¢ | 19.5¢ | 3597838 | ||
Last updated 15.59pm 14/06/2024 ? |
Featured News
STX (ASX) Chart |