STX 2.33% 21.0¢ strike energy limited

I cannot understand why certain parties cannot accept the fact...

  1. J L
    1,719 Posts.
    lightbulb Created with Sketch. 167
    I cannot understand why certain parties cannot accept the fact that the only way Walyering can increase output is,

    1. PGP to get more load. If there is any pending, no one is saying, and/or

    2. Transfer PGP gas to the DBNGP. And PGP gas cannot be pumped into the DBNGP at this stage. It is just not possible until the interconnect is established.

    The big man himself, says that output is constrained by lack of load and inability to transfer gas to the DBNGP.

    Please correct me if I am wrong, but with good argument. J L.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
21.0¢
Change
-0.005(2.33%)
Mkt cap ! $600.7M
Open High Low Value Volume
21.5¢ 21.5¢ 21.0¢ $526.5K 2.486M

Buyers (Bids)

No. Vol. Price($)
19 433633 22.5¢
 

Sellers (Offers)

Price($) Vol. No.
19.5¢ 500581 21
View Market Depth
Last trade - 15.59pm 16/07/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.