Current Operations
Since the last update, Strike has successfully suspended WE3 with a series of cement plugs. Subsurface, Engineering and Procurement works are ongoing with regards to the plan on taking WE3 to final depth. Post the suspension of WE3, Rig 970 packed down, moved and setup at the WE4 lease. The operations went smoothly without incident and the efficient move has allowed for several maintenance programs to be carried out.After the completion of the pre-spud checklist, WE4 was officially spud over the weekend and drilling operations have commenced
.Forward Plan Strike will drill the 26” surface hole section from the pre-installed conductor to a nominal depth of 1,200m.
- Forums
- ASX - By Stock
- STX
- Ann: West Erregulla Update
Ann: West Erregulla Update, page-3
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
22.0¢ |
Change
0.005(2.33%) |
Mkt cap ! $630.3M |
Open | High | Low | Value | Volume |
22.0¢ | 22.0¢ | 21.5¢ | $113.9K | 520.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
29 | 2564403 | 21.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 973685 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
29 | 2564403 | 0.215 |
38 | 1529925 | 0.210 |
25 | 963435 | 0.205 |
32 | 1110401 | 0.200 |
13 | 943856 | 0.195 |
Price($) | Vol. | No. |
---|---|---|
0.220 | 965492 | 22 |
0.225 | 847337 | 13 |
0.230 | 926458 | 12 |
0.235 | 1153327 | 15 |
0.240 | 1260365 | 17 |
Last trade - 10.45am 17/10/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |
The Watchlist
JBY
JAMES BAY MINERALS LIMITED
Andrew Dornan, Executive Director
Andrew Dornan
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online