WE5 will be approved in time for when it needs to be drilled after testing and appraisal of WE4
Walyering will also be approved in time for when a rig is available to go down there.
WE3 will be the last as it will require re-engineering, extensive mods, BOP, and other stuff. Possibly another rig (worse case scenario).
SE is when we finish playing with WE appetizers and start the REAL drills and appraisals.
Plenty of GAS for WA and for all of australia should the pipes ever get extended to Moomba from Kalgoorlie.
Fertilizer sovereign independence and self-sufficiency from Project Haber.
96c target this year or 1H next.
$2.46 1H 2023
All my wild guess and opinions... DYOR!
- Forums
- ASX - By Stock
- Ann: West Erregulla Update
WE5 will be approved in time for when it needs to be drilled...
-
-
- There are more pages in this discussion • 97 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add STX (ASX) to my watchlist
(20min delay)
|
|||||
Last
21.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $615.0M |
Open | High | Low | Value | Volume |
22.0¢ | 22.0¢ | 21.5¢ | $1.130M | 5.217M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 745901 | 21.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 1123287 | 15 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 574206 | 0.215 |
49 | 3948365 | 0.210 |
39 | 1771063 | 0.205 |
59 | 2982268 | 0.200 |
32 | 2019627 | 0.195 |
Price($) | Vol. | No. |
---|---|---|
0.220 | 1068011 | 14 |
0.225 | 1022636 | 7 |
0.230 | 790576 | 19 |
0.235 | 1196909 | 12 |
0.240 | 486860 | 9 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
STX (ASX) Chart |