STX 4.65% 22.5¢ strike energy limited

I find it intriguing that after 300m of drilling and only...

  1. 146 Posts.
    lightbulb Created with Sketch. 16
    I find it intriguing that after 300m of drilling and only halfway through a reservoir, this was determined to be a good point to pull out and run wireline logs over half a reservoir. Why not drill out this reservoir section and then run logs prior to drilling on to primary target?

    My guess is either something happened to the BHA that required a manual alteration (I don't think a bit dulls after 300m) or they saw something on LWD or at the shakers they they want a closer look at ASAP.

 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
22.5¢
Change
0.010(4.65%)
Mkt cap ! $643.6M
Open High Low Value Volume
22.5¢ 23.0¢ 21.5¢ $3.339M 14.95M

Buyers (Bids)

No. Vol. Price($)
7 337869 22.5¢
 

Sellers (Offers)

Price($) Vol. No.
23.0¢ 1651352 24
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.