MGV 0.00% 39.0¢ musgrave minerals limited

My thoughts on the offer.The MRE was announced 31 May 2022 and...

  1. 1,071 Posts.
    lightbulb Created with Sketch. 116
    My thoughts on the offer.
    The MRE was announced 31 May 2022 and the stage 1 PFS on 5 May 2023.
    A lot of drilling has been done since the MRE with the potential to add considerable ounces, and upgrade the inferred ounces.
    The latest from MGV , 23 May 2023, after the good results at Leviticus was:
    "Activities associated with delivery of a Stage 2 PFS for the Cue Gold Project are continuing. A significant amount of drilling has been undertaken to convert Inferred Resources to the higher
    confidence Indicated category on our high-grade Break of Day and White Heat deposits. This will lead into a Mineral Resource update in late 2023. The Stage 2 PFS will focus on adding mine life and further enhancing the attractive economics of the project."
    So the value of MGV should not be set by the stage 1 PFS but really needs to be set by the stage 2 PFS.
    I'm happy to wait for late 2023 unless someone makes a good case that they are offering stage 2 value.


 
watchlist Created with Sketch. Add MGV (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.