They need mega high grade, processing 7-9t per hour is snail's pace and 60 staff to pay.Need to be lean.
60 staff at $70 per hour = $4200/hr but probably more
fuel
power
etc etc
8t * 10g/t / 31.1 = 2.57oz/hr * $2510= $5020 then probably 75% recovery at best = $3765/hr
Gee even if they are mining 20g/t ore I wouldn't bet on them making a profit.
- Forums
- ASX - By Stock
- Ann: White Rock Recommences Gold Production at Morning Star Mine
They need mega high grade, processing 7-9t per hour is snail's...
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)