WIN 0.00% 2.4¢ win metals ltd

Ann: Widgie Nickel Quarterly Activities Report & Appendix 5B, page-18

  1. 2,924 Posts.
    lightbulb Created with Sketch. 1085
    There's a difference between cutting the portal in the lower wall of the Armstrong pit (currently being dewatered) and getting into production. If the portal is 20 metres above the pit base (so as not to flood the underground) and assuming a 20 metre crown pillar is left under the pit, the first production level will be 60 metres vertical beneath the portal. With the decline ramp at a 1 in 7 gradient that is 420 metres of 5 x 5.5m development. Add in stockpiles, sumps, escape way cuddies, vent drive and level accesses then you are approaching total lateral development of 1000 metres, mostly single heading. Aside from this there is all the vertical development required for vent and escape ways and also grade control plus production drilling. After cutting the portal mid year (hopefully) I can see development ore being trucked by Xmas tis year but production ore will be more like March and that's assuming a top down sequence leaving pillars.
 
watchlist Created with Sketch. Add WIN (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
0.000(0.00%)
Mkt cap ! $7.659M
Open High Low Value Volume
2.4¢ 2.4¢ 2.4¢ $229 9.523K

Buyers (Bids)

No. Vol. Price($)
1 39526 2.4¢
 

Sellers (Offers)

Price($) Vol. No.
2.5¢ 668276 1
View Market Depth
Last trade - 10.09am 09/07/2024 (20 minute delay) ?
WIN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.