Highlights
• Wiluna open pit mining commences in free milling ore from surface
• Wiluna average ore grades higher than the Matilda ore
• In line with the mine plan adopted at the start of the year, the remaining open pits at Matilda will
be mined concurrently with the Wiluna open pits for the rest of this financial year
• Processing of higher grade Wiluna ore will take place from Oct’18
• All the Wiluna open pits are located within 3kms of the plant, significantly lowering haulage costs
• Grade control and mining of free milling pits will significantly de-risk the larger sulphide pits prior
to re-commissioning the sulphide circuit
BLK Price at posting:
4.6¢ Sentiment: Hold Disclosure: Held