Doing the calcs on the Polish DBM agreement and using previously announced information the 20,000T of DBM will require mining 60,000 t of rock.60,000T @ 80/20 fines/rock = 48,000t rock Raw to DBM is a 2.1-2.5 conversion.
However on a EBITDA front the 20,000T is equivalent to selling 300,000t of DSO which would require mining 375,000.
Just the Polish offtake has the potential for a EBITDA of $10-15m and can fund/justify the mine so is a significant first step.
DYOR IMO
- Forums
- ASX - By Stock
- Ann: Winchester magnesium carbonate project strategy
Doing the calcs on the Polish DBM agreement and using previously...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
Add KOR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.936M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KOR (ASX) Chart |
Day chart unavailable