WBE 0.00% 1.4¢ whitebark energy ltd

Ann: Wizard Lake Facilities Successfully Operating, page-2

  1. 25,497 Posts.
    lightbulb Created with Sketch. 1196
    Highlights
    • The upgraded facilities at Wizard Lake have been fully operational since 21 December 2019.
    • Gas is being successfully transported in the 15km pipeline to Petrus and sold into the Atco system.
    • Following filling of the new onsite oil separation and storage facilities, oil sales from the facilities commenced
    on the 2 January 2020.
    • As is normal practise in these fields, the wells are slowly being brought back into production to preserve
    reservoir integrity and maximise long term production.
 
watchlist Created with Sketch. Add WBE (ASX) to my watchlist
(20min delay)
Last
1.4¢
Change
0.000(0.00%)
Mkt cap ! $2.688M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 1075000 1.3¢
 

Sellers (Offers)

Price($) Vol. No.
1.5¢ 552359 2
View Market Depth
Last trade - 16.12pm 21/05/2024 (20 minute delay) ?
WBE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.