Answer: The arbitrary requirement, if it even exists at law under the mining license, would be extended. At absolute worse it would require renewal or reapplication. The underlying exploration tenure is not affected in any way.
- Forums
- ASX - By Stock
- Ann: Woodlark Gold Project - Progress Update
Answer: The arbitrary requirement, if it even exists at law...
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $26.22M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 150000 | 2.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 4000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 884744 | 0.024 |
3 | 1060786 | 0.023 |
4 | 1700000 | 0.022 |
2 | 325000 | 0.020 |
1 | 96000 | 0.019 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 4000 | 1 |
0.028 | 234931 | 2 |
0.029 | 898309 | 2 |
0.031 | 100000 | 1 |
0.032 | 161291 | 1 |
Last trade - 16.12pm 18/10/2024 (20 minute delay) ? |
Featured News
GPR (ASX) Chart |
Day chart unavailable